Quality control is a sequence of decisions, not a final inspection. This page sets out the control model to agree for a custom program: approved inputs, defined gates, records, and a release decision that can be traced back to the sample it was based on.

Each gate has an approved input, a defined check, a record, and a decision. A gate that cannot stop work is a report, not a control.

The control chain

1
Approved input

Specification, sample, material and proof versions are locked before production.

2
Defined check

Each gate states what is checked and against which reference.

3
Record

The result is written down, with the lot and the date it applies to.

4
Release decision

Release, rework or hold, by a person with the authority to decide.

Control begins before production, not at the loading dock.

Scope and limits

What the control model covers, and what it does not

The model is a structure for decisions. It does not publish acceptance numbers, and it does not replace a buyer's own inspection requirement.

Control areas and their boundaries

AreaCoveredBoundary
Version controlLocking the specification, sample, artwork and packing versions that production must follow.The lock is only as good as the inputs supplied; an unapproved input cannot be locked.
Incoming materialChecking fabric, trims and labels against the approved reference before use.No material specification or tolerance is published here.
In-process controlCutting, decoration, sewing and measurement checks while work is still correctable.The check plan is project-specific, not a universal schedule.
Finished goodsItem-level review and lot-level release logic against the approved state.No AQL level, sample size or acceptance number is stated on this page.
Corrective actionLinking an issue to its cause, the affected lot and the decision taken.Records belong to the specific order; no client record is reproduced.

Where a buyer's own standard is stricter than the project plan, the buyer's standard governs. Where a requirement is undefined, the gate returns a question rather than an assumption.

Process

Seven stages from approved sample to released shipment

The stages are sequential because each one depends on the state the previous stage released.

1

Technical review and version lock

Identify the specification, sample, artwork, material, label and packing version production must follow.

2

Incoming material control

Review fabric, trims, labels and packing against the approved requirement before use.

3

Pre-production release

Confirm the required sample, color, decoration, construction and inspection plan before bulk starts.

4

In-process control

Check cutting, decoration, sewing, measurements and components while the work can still be corrected.

5

Finished garment screening

Review workmanship, branding, labeling, measurement and presentation at item level.

6

Lot release decision

Assess the order as a lot against the agreed acceptance logic.

7

Packing and shipment release

Reconcile product, quantity, labels and packing, then release for shipment.

Stages are described as a control structure. The applicable checks, their frequency and the acceptance logic are defined against the approved project specification, because a knitted top and a structured garment do not carry the same risks.

Technical decisions

What actually gets decided at each gate

These are the decisions that separate a controlled run from an inspected one.

Gate decisions and records

DecisionWhy it is decided before productionWhat the record carries
Which version is productionTwo live versions produce two products.Version identifier, date, and the person who locked it.
Which reference proves colorA shade argued without a reference is argued twice.The approved proof type, its date and its storage location.
Which measurement basis appliesA chart without its wash state and unit cannot be checked.Unit, points of measure, and the condition the chart applies to.
Which check can stop a lotA control without stop authority is advisory.The check, the trigger, and the person authorized to hold.
What counts as a concessionAn accepted difference changes the approved state.The difference, who accepted it, and the date.
What closes an issueAn issue closed by conversation reopens at the next order.Cause, correction, affected lot, and verification.

Evidence boundary

What can be shown, and what cannot be claimed yet

An evidence page is only useful if it is honest about what exists. This section states the boundary rather than implying records that are not published.

Process evidence

The control model, the gate sequence and the record format can be described, because they are process decisions.

Record evidence

Order-specific inspection records, defect data and corrective actions belong to a specific program. None is published on this page.

Certificate evidence

No certificate, audit report or test result is claimed here. Request any required certificate with its issuer, scope, validity and relevance to your program.

If a specific record is needed for an evaluation, request it and state the program it relates to.

Inputs

What a control plan needs from the buyer

The plan can only control what has been approved. These inputs are the minimum.

Before a control plan is agreed

Missing inputs become open items at the first gate, not assumptions in production.

The approved specification or tech pack
The approved sample, physically identified
Approved material and color proofs
The measurement chart with its unit and wash state
Decoration proofs and placement record
Packing and labeling requirement
The buyer's acceptance requirement, if stricter than the plan

Factory and QC questions

Questions buyers ask about production control

These answers describe the control structure, not a certificate or a capacity claim.

Does KnitCertain inspect every garment?
The check plan is defined per program, so the answer depends on the product and the agreed acceptance logic. This page does not state a universal inspection level, because a number published without its scope would be read as a promise across every order.
Who can stop production?
A control is only real if someone can act on it. The plan names the person authorized to hold a lot and the trigger for doing so, rather than leaving the decision to whoever notices first.
What happens when a check fails?
The lot is held, the cause is identified, and the affected units are isolated before any correction is applied. A correction applied without isolating the affected work usually spreads the problem.
Can I use my own inspection standard?
Yes, where it is stated in the approved requirement. The project plan follows the stricter of the two, and the difference is recorded so both sides are checking against the same document.
Is a certificate the same as a quality system?
No. A certificate states that an audit or test was passed at a point in time within a scope. A quality system is how decisions are made on this order. Both can matter, and they answer different questions.

Start project evaluation

Ask how the control plan applies to your program.

Share the product and the acceptance requirement. The answer can then be about your order rather than about a general process.

  • Product and construction
  • Approved sample and specification state
  • Your acceptance requirement
  • The evidence you need to see
  • The delivery structure

Choose one starting route

Share the product and the acceptance requirement.